Hereford in N Gauge in the Loft
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
David's story of the construction of Hereford station building in N-Gauge continues:
https://rogerfarnworth.wordpress.com/20 ... -station-5
https://rogerfarnworth.wordpress.com/20 ... -station-5
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
Before bringing the completed station to me, David took the attached pictures of his model.
https://rogerfarnworth.wordpress.com/20 ... rt-station
https://rogerfarnworth.wordpress.com/20 ... rt-station
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
This is the final post from David about his work on the model of Hereford Station:
https://rogerfarnworth.wordpress.com/20 ... -station-7
https://rogerfarnworth.wordpress.com/20 ... -station-7
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
The card models on the layout were constructed from drawings made on 'Paint'. I have just loaded drawings of the Signal Box at the North of the Station and of the Station footbridge onto my blog. The relevant links are:
https://rogerfarnworth.wordpress.com/20 ... card-model
and
https://rogerfarnworth.wordpress.com/20 ... in-n-gauge
https://rogerfarnworth.wordpress.com/20 ... card-model
and
https://rogerfarnworth.wordpress.com/20 ... in-n-gauge
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
A link to a wider range of photos about the Hereford layout:
https://rogerfarnworth.wordpress.com/20 ... hotographs
https://rogerfarnworth.wordpress.com/20 ... hotographs
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
It has been quite a while since I posted on this thread, so I thought a few pictures might be a good idea after visit to my loft last week.
http://rogerfarnworth.com/2018/11/10/he ... ember-2018
Sadly progress is very slow as other matters have demanded my time.
http://rogerfarnworth.com/2018/11/10/he ... ember-2018
Sadly progress is very slow as other matters have demanded my time.
- NedFlanders
- Posts: 184
- Joined: Mon Feb 01, 2016 7:56 pm
Re: Hereford in N Gauge in the Loft
Very impressive.
I admire anyone who can either design in or just plain use CAD /Paint/Corel Draw/etc. Those type of applications only ever seem to produce disappointing results for me. Yours, and of course David's, are fabulous.
Ned.
I admire anyone who can either design in or just plain use CAD /Paint/Corel Draw/etc. Those type of applications only ever seem to produce disappointing results for me. Yours, and of course David's, are fabulous.
Ned.
Getting back into railways, one step at a time.
Ned's Workbench - https://tinyurl.com/y4jby73c
The UppydownyRoundyRoundyRailway - https://tinyurl.com/y6stelsr
Ned's Workbench - https://tinyurl.com/y4jby73c
The UppydownyRoundyRoundyRailway - https://tinyurl.com/y6stelsr
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
Thank you, Ned.
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
It has been a while since I posted about my layout.
We have now moved to Telford and the powers that be have generously allocated a relatively large bedroom for the layout. Some compromises are inevitable as the space is smaller than the loft in the Vicarage in Ashton-under-Lyne.
Staging has been built and my library is close to being sorted out. I will need one new fiddle yard, the electrics will need connecting board to board for the layout and some damage will need to be rectified.
Completing the staging is a good step forward!
We have now moved to Telford and the powers that be have generously allocated a relatively large bedroom for the layout. Some compromises are inevitable as the space is smaller than the loft in the Vicarage in Ashton-under-Lyne.
Staging has been built and my library is close to being sorted out. I will need one new fiddle yard, the electrics will need connecting board to board for the layout and some damage will need to be rectified.
Completing the staging is a good step forward!
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
Hereford in N again, the Move. ...
Moving felt like a major exercise. I have a large amount of stock and initially could not imagine how I might be best getting it all from one home to another. ...
http://rogerfarnworth.com/2022/06/13/n- ... for-moving
Moving felt like a major exercise. I have a large amount of stock and initially could not imagine how I might be best getting it all from one home to another. ...
http://rogerfarnworth.com/2022/06/13/n- ... for-moving
-
- Posts: 514
- Joined: Wed Mar 28, 2018 9:36 pm
Re: Hereford in N Gauge in the Loft
Hereford in N again, the Move. ...
Moving felt like a major exercise. I have a large amount of stock and initially could not imagine how I might be best getting it all from one home to another. ...
http://rogerfarnworth.com/2022/06/13/n- ... for-moving
Moving felt like a major exercise. I have a large amount of stock and initially could not imagine how I might be best getting it all from one home to another. ...
http://rogerfarnworth.com/2022/06/13/n- ... for-moving