Hi all , hope everyone had a great festive period and new year
I spent the holiday period out of the attic and away from modelling as I was getting a little cba with it but since going back to work I've been quite busy.
First up I attempted a scratchbuilt viaduct although after finishing one elevation I ended up running out of brick paper (I did think I had another pack but I obviously didn't!) so I'll post photo's of the build when I've finished it.
The main thing I've been up to over the past week is electrics and I must say WOW!!!

It is a very steady progress although in some ways its been very therapeutic too! I had it all to do really - bus wires, droppers, points and whilst trying to sort it out ended up slightly altering the trackwork too!

Anyway, the upshot is that the main fiddle yard area has been wired up fully with points installed - all that is left to do is wiring the switches to the points and connecting them to the power via the CDU. I'm using Seep PM1 points and I have actually wired them up fully ( A C D E F B ) and put the wires into chock blocks so if I change the points to run on DCC in the future its easier to connect up without having to either remove the points or solder wire under the baseboards. Considering I've never done anything like this before I'm quite happy with how I'm progressing.
Anyways, I'll leave you with a screenshot of what will be my control board for the fiddleyard point switches.

- Control Board
Happy modelling All!!
