<Cough cough> Jeez it's a tad dusty in here! A quick sweep through and it's back to basics
Hi folks, I'd like opinions on whether I'm better using ElectroFrog points or Conductive Frog please.....
Also If I use ST-6 turnouts are they electro or conductive ??
Just read through the thread and Emmettman was helpful some time back but his drawing/ picture has gone in the reply he put! I'm trying to sort all the points out I need - I'm using N gauge - and I'm no nearer in my understanding! Would I be right in thinking you need electrofrog points if you intend running trains in both directions on the same length of track (obviously not at the same time!)
My layout is an oval twin track with a six or eight line fiddle yard to the rear and a six line coal yard where one line is accessible from both ends and five are sidings (See below)
The attachment layout bottom2.jpg is no longer available
(Third line at right will join to middle to make two tracks in and out of fiddle yard)
SO to recap with diagram above - 1)Bottom two lines are main line with platforms so they'll be CW and CCW
2) Third line up is a spur/siding that needs to be operational to trains arriving from both directions (points on left hand of main track to be replicated on right but on the curves if that's feasible!)
3) Five sidings in Coal Yard
Any help greatly appreciated.....shall just go and have another play about and study in the hope I get that Eureka moment
