DON'T GO TO MODEL RAILWAY EXHIBITIONS!
Everything has ground to a halt on Loxley Lane, reason, after taking a trip to Mansfield and then Nottingham exhibitions i'm really torn between carrying on with the 6x4 or holding off for a while until i can get the loft sorted out.
I laid out sheets of Javis cork and marked out my trackplan ready to cut out the bed, then thought, i'd better make sure that there is nothing that i want to change so that cork isn't wasted. So i first thought that i would bring the spare siding that was at the top of the layout down to the bottom. It can form a third platform for my station or just be a storage siding, at least i have the choice. Then decided to modify the headshunt as it wasn't really long enough. I have a length of semi-flexi track but found i could do something similar with some odd bits of setrack. But then making the headshunt longer now stops me putting a road bridge where i wanted and i don't think anywhere else will look right. Then i thought, can i get away with a very short headshunt? Answer hit me like Tyson, YES i probably can because realistically it's a 6x4 and anything more than a few wagons is gonna be too much!
And thats it I want to run longer trains and have a bit more flexibility in what and where i want to model. Looking at some of the layouts at the exhibitions and reading some of the threads on here from the likes of Dr Stroganoff etc i'm very jealous...
I still think that it might be a good idea to continue with the little one to practice a bit, but then if i make any cock-ups i'm gonna put them right. So may as well make them on a layout that is gonna stay put and not be dismantled/sold/stuck in the back of the garage in a few months time... the original plan was to move out to the garage, which would have allowed me to keep the 6x4 and just extend/add to it in whatever way suited. now that the garage has been kicked into touch due to cold/damp/(scary monsters!

) it doesn't work because a 6x4 board will not, at least i don't think it will, fit thru a 2x1 loft hatch!
So I'm in limbo, gonna order a loft ladder and work out budgets for flooring and insulation etc and see where we end up. Meanwhile i'm just gonna play trains and maybe build another few metcalfe buildings.
I should have 10 points motors arriving at my LMS tomorrow (birthday pressie from the missus) and i went and bought all components to build a CDU the other day along with switches, cable for the BUS, a soldering iron, a dremmel type thingy etc etc so i have all the kit to finally get this layout started for real but just can't make up my mind what to do???

It'll probably be 2-3 months before i can get the loft sorted out and ready to start which is gonna be really frustrating...aaaaagggghhhhh
That has to be the most boring and depressing post in history? What would you guys do?
Cheers
Graeme