Yet another change in tack as I look forward to "commissioning" the shed.
I had originally decided not to install the pits within the shed itself as they wouldn’t be that visible, but then I changed my mind and set about ripping out the sleepers.

- Initial hacking out of the sleepers and underlay.

- A tidier position.

- The yellow outline is where the shed will be sited, and pink is the sand drying house.
The short siding stub on the left looks "lacking" as regards buffer stop. However quite a few sidings at Hawick are marked on my official drawing as "NO BUFFER" and this is just one of them.
The tracks have been inlaid with closed cell foam, as the “grot” was built up to rail level where the doors swung across - I think I need to re-blacken the interior pits a bit – the white weathering powders have come out too strong as there shouldn't be too much ash in the shed itself.
Attention will next switch to the shed doors.