Re: Tramways in Provence

Postby rogerfarnworth » Mon Jul 16, 2018 1:27 pm

This post covers another short-lived tramway which provided a service up the valley of l'Esteron from Pont Charles Albert over the River Var to Roquesteron, a distance of more than 20 kilometres.

https://rogerfarnworth.wordpress.com/20 ... rovence-66

06pont-charles-albert03.jpg
06pont-charles-albert03.jpg (54.07 KiB) Viewed 83 times



Before the tramway was constructed the Charles Albert Bridge was a suspension bridge (built by Marc Seguin in the mid-19th Century) [2] but this bridge was not designed to accommodate tramway loading. In 1913 it was rebuilt to accommodate the trams, just as was necessary with the Pont de la Mescla on the Tinée tramway. The replacement structure had six spans of over 30 metres in concrete built by the company Thorrand. In the foreground of the image immediately below, there is the Pont-Charles Albert stop and the lime kilns at La Lauziere overseen by the perched village of La Roquette sur Var, © Yann Duvivier. [6] This 'new' bridge was replaced in the mid-20th Century by the one which is in use today.


img_20180712_201653_126.jpg

rogerfarnworth
Posts: 147
Joined: Wed Mar 28, 2018 9:36 pm

Re: Tramways in Provence

Postby rogerfarnworth » Wed Jul 18, 2018 7:48 pm

Another of the branch tramways left the Nice to Digne line close to La Mescla Station and travelled up the valley of La Tinee.

https://rogerfarnworth.wordpress.com/20 ... rovence-67


I first looked at this tramway in 2013. It was only a short blog recognising the existence of the line in the valley.

https://rogerfarnworth.wordpress.com/20 ... nee-valley.

This line was 26.5 Km long and connected villages in the Tinée valley to Nice to Digne line. Like other lines of the Tramways Alpes Maritimes (TAM), the electric current was single phase. The civil engineering works (bridges, tunnels) were executed by the Department.

The line was built in 1911 and operation started on 1st April 1912. Landslides affected the operation of the line in the early months. The original opening was delayed from January to April because of landslides and on 2nd April a further landslide affected several hundred metres of track and destroyed power lines.

The line ceased operations in 1931.



The available imagery from the time of the tramway is limited in extent and is supplemented by images from later dates.

rogerfarnworth
Posts: 147
Joined: Wed Mar 28, 2018 9:36 pm

Re: Tramways in Provence

Postby rogerfarnworth » Wed Jul 25, 2018 10:43 pm

New territory for me. The now removed TAM tramway from Pont de Gueydan to Guillaumes up Les Gorges de Daluis .....

https://rogerfarnworth.wordpress.com/20 ... rovence-69

The line from Le Pont de Gueydan north to Guillaumes followed the valley of the River Var and ran through the Gorges de Daluis.

Marc Andre Dubout, writing in French, says that the line was probably the moist daring of secondary line construction work with very steep gradients, numerous tunnels, two remarkable bridges. He comments that it is the most impressive tramway from a tourist perspective with 'unique viewpoints and singular landscapes'.


One of the bridges on this route has the distinction of being one of the earliest reinforced concrete arch structures in France.