
Ribbleshire- Dave "2"s OO gauge layout.
- PTmodeller
- Posts: 965
- Joined: Wed Sep 27, 2006 9:09 pm
- Location: Preston, Lancashire.
Re: PTModellers 9' by 5' OO gauge layout.
Better than that, Double Slips!
You can go anywhere on them, Thanks again for them Bryan Grundy.

- Metrocamel
- Posts: 847
- Joined: Mon May 01, 2006 8:49 am
- Location: UK
Re: PTModellers 9' by 5' OO gauge layout.
I don't trust double slips since I almost wrecked my 158. All those points...
"Out of commission become a pillbox, out of ammo become a bunker, out of time... become heroes"
Layout updated 18/10/09!
viewtopic.php?f=22&t=5360&p=215267#p215267
Layout updated 18/10/09!
viewtopic.php?f=22&t=5360&p=215267#p215267
- PTmodeller
- Posts: 965
- Joined: Wed Sep 27, 2006 9:09 pm
- Location: Preston, Lancashire.
Re: PTModellers 9' by 5' OO gauge layout.
The river is NOT waterproof...
- Metrocamel
- Posts: 847
- Joined: Mon May 01, 2006 8:49 am
- Location: UK
Re: PTModellers 9' by 5' OO gauge layout.
Sorry to hear that. And it looked so great.
Let us hope the rest of the world's rivers retain their watertightness.
Edit- what did u coat it with?

Let us hope the rest of the world's rivers retain their watertightness.
Edit- what did u coat it with?
"Out of commission become a pillbox, out of ammo become a bunker, out of time... become heroes"
Layout updated 18/10/09!
viewtopic.php?f=22&t=5360&p=215267#p215267
Layout updated 18/10/09!
viewtopic.php?f=22&t=5360&p=215267#p215267
- PTmodeller
- Posts: 965
- Joined: Wed Sep 27, 2006 9:09 pm
- Location: Preston, Lancashire.
Re: PTModellers 9' by 5' OO gauge layout.
The Control Panel unfolds.....

This will be one of an eventual possible three- one controlling double slips, this one for the Depot and potentiually another one for the yard isolating sections.

This will be one of an eventual possible three- one controlling double slips, this one for the Depot and potentiually another one for the yard isolating sections.
- PTmodeller
- Posts: 965
- Joined: Wed Sep 27, 2006 9:09 pm
- Location: Preston, Lancashire.
Re: PTModellers 9' by 5' OO gauge layout.

Viaduct also takes shape...
Work continues behind the scenes on the electrics
Re: PTModellers 9' by 5' OO gauge layout.
That viaduct looks like its going to be a cracker - look at the size!
- PTmodeller
- Posts: 965
- Joined: Wed Sep 27, 2006 9:09 pm
- Location: Preston, Lancashire.
Re: PTModellers 9' by 5' OO gauge layout.
davek wrote:That viaduct looks like its going to be a cracker - look at the size!
Sorry, but it'll be cut down a bit
- Metrocamel
- Posts: 847
- Joined: Mon May 01, 2006 8:49 am
- Location: UK
Re: Ribbleshire- Dave "2"s OO gauge layout.
Viaduct looking good
How have you been getiing on with it?

"Out of commission become a pillbox, out of ammo become a bunker, out of time... become heroes"
Layout updated 18/10/09!
viewtopic.php?f=22&t=5360&p=215267#p215267
Layout updated 18/10/09!
viewtopic.php?f=22&t=5360&p=215267#p215267
- PTmodeller
- Posts: 965
- Joined: Wed Sep 27, 2006 9:09 pm
- Location: Preston, Lancashire.
Re: Ribbleshire- Dave "2"s OO gauge layout.
Metrocamel wrote:Viaduct looking goodHow have you been getiing on with it?
It's got an extra arch and pillar know, the first arch is fabricated, the others are cut out.
Re: Ribbleshire- Dave "2"s OO gauge layout.
Looking good - particularly like the coal loads you produced a few pages back -- and the weathering of that loco looked pretty damn good. I still can't decide whether to have a bash myself on a loco, or just get them done by someone else... hmmm... perhaps I shd practice some more on old wagons...
- PTmodeller
- Posts: 965
- Joined: Wed Sep 27, 2006 9:09 pm
- Location: Preston, Lancashire.
Re: Ribbleshire- Dave "2"s OO gauge layout.
Buy an old Lima- that 31 cost £20. Cheap Lima stuff coming out of your ears on Ebay!
Just a quick update to say some ballasting been done, tunnel mouth just needs painting, viaduct is progressing- slowly. So far the 3D shell of three arches and one piller has been done.
Thanks
Just a quick update to say some ballasting been done, tunnel mouth just needs painting, viaduct is progressing- slowly. So far the 3D shell of three arches and one piller has been done.
Thanks
Re: Ribbleshire- Dave "2"s OO gauge layout.
I'm Glad to hear that progress is still being made Dave!
How's the viaduct coming along?
How's the viaduct coming along?

- PTmodeller
- Posts: 965
- Joined: Wed Sep 27, 2006 9:09 pm
- Location: Preston, Lancashire.
Re: Ribbleshire- Dave "2"s OO gauge layout.
Slowly...

The river underneath is coming on a bit, anyway...


The river underneath is coming on a bit, anyway...

Return to “Personal Layouts - Under Construction”
Who is online
Users browsing this forum: No registered users and 43 guests