Well it's been quite a while since I ventured back into the world of model railways due to our cave being renovated. New kitchen extention, new kitchen, bedrooms, lounge, garden modified, her own 'playroom', all done. The layout has been re-built for some time but haven't been able to 'play' that much til now. Its' new home is a large garage but the scenic part of the layout has not been modified to fit as you can see from the photo. There is a longer 'run round' but that's the only alteration.


You will also see that the left hand 'walls' of the engine shed and station buildings haven't been finished! In its original location I was unable to view those sides. I suppose I shall have to finish them off now!
One practical problem has arisen though which has reinforced my thoughts on changing some of the wire-in-tube controlled points to being motorised. The temperature variations in the garage are causing me to constantly tweak the free movement on the longest runs to get the point throw right. To be honest, a real pain. However, not having ever used point motors I will be asking for peoples thoughts and advice in a separate thread.
Well thats it for now, but so glad to be back.