Thanks as always for the suportive comments everyone!Ex-Pat wrote:Great to see progress Jim.
Will there be track on that raised long stretch of ply on the right, is it to be Gateside or is it just for buildings?
Ex-Pat - the stretch behind the backscene will be hidden sidings forming "Fiddle South" (ECML/Waverley Route etc), four long tracks capable of holding eight coach trains, although 5 to 6 will be the norm. Gateside will be on the other side (eventually). As usual I started with a nice neat drawing, scanned it and now have altered it so that it is very untidy looking.
Need to click on the photograph and enlarge for it to be any use!
Cheers
Jim