Hi again,
Little more progress on the upper level.
I have decided to cheat a little and I have bought a ready to plant refuelling point from the scenecraft range. I have attached some power to the upper level and made a hole in the back scene which will lead to the upper storage area. I've run my class 20 around it, where I can, to test and everything seems to be fine - I've just got to cut and place the correct length sidings now.
I used dowels to control the lower level scenic points but on a recent trip to Exeter I saw some wire and tube on sale - so I thought I'd give it a try. The wire is very thin but remarkably effective when housed in the tubing, even when you are 'pushing' the point. The tube is PTFE and is flexible so you can bend the line to suit the surroundings. At £10 For two packs of wire and two packs of tube (6 metres in total) its pretty good value in my opinion.
Enough with the talk and on with the pics:
New refuelling point

- 20jan10- 001.jpg (76.31 KiB) Viewed 1886 times

- 20jan10- 002.jpg (60.58 KiB) Viewed 1882 times
Exit to upper storage (notice point wire and sleeving)

- 20jan10- 006.jpg (70.52 KiB) Viewed 1883 times

- 20jan10- 003.jpg (65.69 KiB) Viewed 1884 times
Overall view of upper level - sometime I'll try to photograph it in the daylight!

- 20jan10- 005.jpg (71.03 KiB) Viewed 1884 times
Cheers,
James