Been quiet for a while, dismantled by 6x4 board layout (see my other posts), been given the green light by the missus for a layout in the spare bedroom/rabbits room!
This is my initial plan. Comments please. 2 branch line stations, 1 terminus station (lower left), tunnel is orange bit top right, lower shaded area infront of main line is an engine shed/carriage works. Line is based on late 90's era and will be operating mainly 150, 156 and 153 DMU's (so the 2nd radius curves I can live with - thou have hid them as much as possible to not see carriage overhang).
I aim to keep the shelve 12-14"'s from the wall all round. Control location is bottom right.
Aiming for 3 months from start > near completion (exluding signal and point automation).
Comments please. Wish me luck - as previously I will keep posted with pics!
