Postby CandO » Mon Jul 11, 2016 6:35 pm

Well after a bit of a cock-up posting the first attempt at this topic I'll try again! :lol:

The C and O baseboards have begun their construction but the first thing I must mention is the new toy - a Compound Mitre Saw. How on earth I haven't invested in one of these beauties years ago I'll never know! So much time saved cutting timbers and knowing they'll have a true edge it is a totally invaluable piece of hardware imho.....well worth the investment :D

P1060841.JPG
The new toy!
P1060841.JPG (112.32 KiB) Viewed 1955 times


Anyways on with the build. I'd purchased the boards and the timbers some time ago but due to other factors nothing had happened so now a bit of normality has descended I intend to get on and get the boards done asap.

The layout is going to be four boards - two central boards of 5' x 2' each (which will be hinged along a long side so they fold down together) with two 4' x 2'6" boards at either end which will give me a 10' x 4' layout. It seems large I know but as I'm modelling an actual place I need 6' in the centre with the other 2' at each end to accommodate the return curves to the rear fiddle yard. I was originally looking at OO scale but 20' x 8' was a tad on the large size :lol:

I started with the centre boards. Using the new toy I cut the long sides and the cross pieces. I then laid them on the boards to ensure everything was ok.

P1060843.JPG
Timbers cut...
P1060843.JPG (62.52 KiB) Viewed 1955 times


To fix the timbers to the board I first pinned one end of a long side square to the board and then pinned the other end before drilling and screwing into place. I then pinned at regular intervals to ensure all was flush with the edge of the board before final drilling and screwing took place. Once the two boards were done like that I turned my attention to the cross pieces.

Knowing where the track would be I only needed holes for wires on one side so using a spade bit I drilled three holes at regular intervals. The cross pieces had all been cut a mm or two longer than needed so that a good fit could be achieved between the long battens by trimming and thus minimise any twisting that may occur when screwed in place. The picture below shows the two boards with the three central cross pieces now fixed in place. I'm leaving the end pieces for now as I want to marry them up with the side of the end board to ensure a good connection between boards but I've not quite decided on the best approach :D

P1060846.JPG
Two boards virtually done!
P1060846.JPG (97.77 KiB) Viewed 1955 times


So that's where I'm up to so far....I'm now off to apply the piano hinges :D

User avatar
alex3410
Posts: 3431
Joined: Wed Nov 14, 2012 4:39 pm
Location: Essex

Re: C and O - And so it begins!

Postby alex3410 » Mon Jul 11, 2016 8:03 pm

A Mitre Saw is an absolute must - mine was fantastic when building my baseboards and gave me a much better finish

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Mon Jul 11, 2016 8:08 pm

i have been fitting the hinges to the central boards tonight :D

Using the router I made two shallow grooves along the joint....

P1060848.JPG
P1060848.JPG (83.61 KiB) Viewed 1944 times


......to ensure the hinges would sit slightly below the surface....

P1060849.JPG
P1060849.JPG (96.94 KiB) Viewed 1944 times


The moment of truth was when both boards were opened up! :D

P1060851.JPG
P1060851.JPG (88.21 KiB) Viewed 1944 times


There is a very slight mismatch at the bottom edge but as this bit is under water on the layout I'm going to leave it as is! :D

User avatar
alex3410
Posts: 3431
Joined: Wed Nov 14, 2012 4:39 pm
Location: Essex

Re: C and O - And so it begins!

Postby alex3410 » Tue Jul 12, 2016 6:53 am

Really nice finish on that, the only thought would be both sides will now have track / bits on? So will it be harder to store?

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Tue Jul 12, 2016 7:18 am

Hi Alex, the plan is to have drop down sides to create a box.....thus protecting the contents.

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Mon Aug 15, 2016 10:46 pm

Have been tremendously busy of late so progress has been slow but I'm getting there! The baseboards are all but completed, just a bit of support bracing to sort, so I've been concentrating on the legs.
I did quite a bit of thinking - and sometimes overthinking (tri-folding legs anyone?) - before deciding on the final option which was also probably one of the cheapest!
Staircase spindles! :D

P1070105b.jpg
Spindles
P1070105b.jpg (55.52 KiB) Viewed 1848 times


The idea was to make all the legs identical so it doesn't matter where they go thus making the assembly of the layout much easier. I had decided on a dozen legs so all I needed to do was ensure they all sat square. Clamping half a dozen together I used the router to cut out the step........and repeated the operation on the second batch whilst the router was set.

P1070102b.jpg
cut out complete
P1070102b.jpg (104.11 KiB) Viewed 1848 times


Now the intention is to affix the bolts permanently in position on the baseboards so the legs just slide on to be secured with wingnuts. In order to achieve this I used my day job as an engineer to manufacture a drilling jig.....

P1070107b.jpg
jig
P1070107b.jpg (83.75 KiB) Viewed 1848 times


....which is placed on the cutout to ensure all the holes in the legs are drilled in the same place and alignment as follows....

P1070108b.jpg
jig in position
P1070108b.jpg (84.24 KiB) Viewed 1848 times


I'll then clamp the jig in the relevant positions on the sides of the baseboards to ensure all the bolts will be exactly the same.

So that's where I'm up to with the CandO baseboard construction.

Hopefully the next lot of pics will be of the legs in position and hopefully a pic of the whole baseboard :D

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Tue Aug 23, 2016 10:46 pm

Well I feel a bit of a milestone has been reached :D

After my last post I had a bit of a fun time fitting the legs! The basic idea was to make the legs interchangeable so when the layout is dismantled it doesn't matter which legs go where upon reassembly. As my joinery skills are just about passable I decided to get some adjustable feet to aid with the levelling of the layout. These were fitted in the standard way....

P1070109a.jpg
feet!
P1070109a.jpg (64.92 KiB) Viewed 1812 times


I also added a small nut and loktited (is that a word?? :lol: ) it in place to aid with any alteration....

P1070111a.jpg
nut
P1070111a.jpg (55.27 KiB) Viewed 1812 times


To fix the legs to the baseboard I used the small jig I used to drill the holes in the leg to drill matching holes through which bolts were placed and hammered into position so that they held themselves in place. The legs were then affixed to the bolts from the back with wingnuts.....

P1070121a.jpg
bolts
P1070121a.jpg (52.87 KiB) Viewed 1812 times


It all ended up with a fully assembled baseboard - all 10' by 4' of it! :D

P1070112a.jpg
Baseboard!! (sorry about the mess!)
P1070112a.jpg (65.28 KiB) Viewed 1812 times


If there's one thing I'm a little concerned about atm it is the fact that there is a slight wobble effect so I now intend to maybe experiment with different leg locations to improve stability BUT it assembles ok so I'm happy :D :D

User avatar
Emettman
Posts: 2287
Joined: Fri Jun 20, 2014 4:43 pm
Location: Cornwall UK
Contact:

Re: C and O - And so it begins!

Postby Emettman » Wed Aug 24, 2016 10:15 am

CandO wrote:
If there's one thing I'm a little concerned about atm it is the fact that there is a slight wobble effect so I now intend to maybe experiment with different leg locations to improve stability BUT it assembles ok so I'm happy :D :D


The answer is triangles.
The legs, or at least a selection of them, need diagonal bracing of some sort
https://www.google.co.uk/search?hl=en&site=imghp&tbm=isch&source=hp&biw=1366&bih=653&q=diagonal+bracing&oq=diagonal+bracing&gs_l=img.12..0l9.2774.9840.0.15124.16.16.0.0.0.0.134.1359.12j4.16.0.cprnk%2Ctoken%3Doa...0...1.1.64.img..0.16.1350...0i10k1.l1kGhC6XoM0#hl=en&tbm=isch&q=leg+diagonal+bracing


Chris.
"It's his madness that keeps him sane."

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Sat Aug 27, 2016 7:01 pm

Major decision made today. After assembling the layout baseboards earlier in the week I was very excited about it but, as the week has worn on, I've had a real rethink and have decided to reduce the size from 10' x 4'. One of the main reasons was it was a little tighter than I thought in the dining room as the gap between the boards and the surrounding items of furniture was quite a squeeze to get through and would certainly be difficult to work with. In hindsight I should of been more aware of this :oops:
Its not a complete 'scrappage' though as I'm using the two end pieces turned 90 degrees to make a more sedate 8' x 2'6". An extra 8' x 1' wide removable strip will be added for the fiddle yard. The back scene will now be attached to the two baseboards permanently and will double as part of the casing structure as well as being the means of attaching the fiddle yard, which in turn will form the casing opposite the back scene.
So, photo attached of the new baseboards (minus fiddle yard boards atm) and some track laid out (not the actual layout as such :wink: )

P1070134a.jpg
New baseboards
P1070134a.jpg (69.31 KiB) Viewed 1768 times

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Wed Sep 14, 2016 8:20 pm

Still around chaps :D Have been ironing out a few kinks in the board construction - making sure things line up correctly, constructing the back scene boards etc. Hopefully get some more pics up soon so you can see the progress which, although slow, is progress!! :lol: :lol:

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Mon Oct 24, 2016 9:33 pm

Finally got around to the pics! :D

So, as I said in my last major post I made a decision to reduce the board size and I'm quite pleased with how its turned out.

I decided to go with a fold-up Fiddleyard at the back so as to reduce the size when the whole thing is collapsed thus making it easier to handle and transport and store. This first photograph shows the first half as its being assembled and fixed in position. The next photo then shows the second half being fixed in position using the first half as a template to ensure both halves were level with each other (hence the left hand side still needing to be trimmed off)

P1070322.JPG
First half.....
P1070322.JPG (72.59 KiB) Viewed 1550 times


P1070329.JPG
....and the second
P1070329.JPG (67.34 KiB) Viewed 1550 times


The next couple of photo's show both sides trimmed off and then in the folded up position. I haven't fixed on any catches yet to keep them up which is why there's a G clamp there! :D

P1070331.JPG
Both sides down....
P1070331.JPG (76.02 KiB) Viewed 1550 times


P1070334.JPG
....and folded up
P1070334.JPG (72.19 KiB) Viewed 1550 times


(continued in next post)

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Mon Oct 24, 2016 9:37 pm

Finally there's an end view showing the main part of the baseboard and the fiddleyard in situ and then a pic showing the holes cut in the backscene board for the track....

P1070336.JPG
End View
P1070336.JPG (50.99 KiB) Viewed 1550 times


P1070338.JPG
Holes
P1070338.JPG (63.14 KiB) Viewed 1550 times


The next job is to assemble the raised trackbed so I feel like I've reached a milestone :D :D

User avatar
CandO
Posts: 134
Joined: Wed Sep 30, 2015 8:53 pm

Re: C and O - And so it begins!

Postby CandO » Sat Nov 12, 2016 8:24 pm

Just a brief update. Started the raised track today, just the left hand side curve but a start nonetheless :D

So here you are, a couple of pics :wink:

P1070381.JPG
Before trimming....
P1070381.JPG (78.59 KiB) Viewed 1496 times


P1070383.JPG
....and trimmed!
P1070383.JPG (74.81 KiB) Viewed 1496 times


Comments gratefully accepted :D

Boïschaut
Posts: 109
Joined: Wed Dec 21, 2016 4:46 pm

Re: C and O - And so it begins!

Postby Boïschaut » Wed Jan 04, 2017 8:38 am

Nice start ! :D Maybe more pics and updates :?:

Dad-1
Posts: 5845
Joined: Sun Aug 24, 2008 8:05 pm
Location: Dorset - A mile from West Bay.

Re: C and O - And so it begins!

Postby Dad-1 » Wed Jan 04, 2017 10:33 am

Rolling Now !!

I like the scenic opportunities offered by having your track raised above
board datum. Just make certain it has enough supports to prevent sag
as & when you add moisture for scenic work.

(Edit Comment)
Should we not now move this to Layouts Under Construction ?

Geoff T.
Remember ... I know nothing about railways.
viewtopic.php?f=22&t=32187 and Another on viewtopic.php?f=22&t=28436&start=60&st=0&sk=t&sd=a


Return to “Baseboard Design and Construction”

Who is online

Users browsing this forum: No registered users and 1 guest